Items where Author is "Herman susila, ST, MT, 0620097301"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 5.

Thesis

Afi Alfian Ubaid Khoiri, A 0118102 and Herman susila, ST, MT, 0620097301 and Ir Dian Arumningsih DP., M,T, 0624096201 (2023) INOVASI LIMBAH ABU SEKAM PADI DAN LIMBAH SERBUK BETON UNTUK PEMANFAATAN BETON MEMADAT SENDIRI EKONOMIS KUAT TEKAN TINGGI. skripsi thesis, Universitas Tunas Pembangunan.

Aan Wahyu Subekti, A0118021 and Reki Arbianto, - and Herman susila, ST, MT, 0620097301 (2023) ANALISIS KAPASITAS DUKUNG LATERAL DAN DEFLEKSI VERTIKAL PADA PONDASI BORE PILE (Studi kasus Pembangunan Klinik Be Hati Surakarta). skripsi thesis, Universitas Tunas Pembangunan.

Septian Nur Wahid Hasan, A0118018 and Herman susila, ST, MT, 0620097301 and Gatot Nursetyo, S.T., M.T., 0620056901 (2023) PERBANDINGAN BIAYA UPAH HARIAN DAN BORONGAN PADA PROYEK PEMBANGUNAN KANTOR URUSAN AGAMA DI WERU, SUKOHARJO, JAWA TENGAH. skripsi thesis, Universitas Tunas Pembangunan.

Shad Farih Ersyad, A0116072 and Herman susila, ST, MT, 0620097301 and Ir Dian Arumningsih DP., M,T, 0624096201 (2023) ANALISIS MANAJEMEN KONSTRUKSI MENGGUNAKAN METODE EARNED VALUE ANALYSIS PADA PROYEK PEMBANGUNAN JALAN DAN JEMBATAN JLS BLITAR- TULUNGAGUNG JAWA TIMUR. skripsi thesis, Universitas Tunas Pembangunan.

WINDI ANJANI, A.0118068 and Herman susila, ST, MT, 0620097301 and Gatot Nursetyo, S.T., M.T., 0620056901 (2023) ANALISIS RISIKO KECELAKAAN KERJA PADA PEKERJAAN FONDASI BORED PILE PROYEK PEMBANGUNAN JALUR KA ELEVATED KM. 104+700 s/d KM. 107+000 SIMPANG JOGLO SURAKARTA. skripsi thesis, Universitas Tunas Pembangunan.

This list was generated on Sat Jan 18 15:01:48 2025 WIB.